Construction Process of Soundprood Office Booth

Date:2024-11-02

A soundprood booth is a new type of small room used to reduce noise, usually used in open office environments, large shopping malls, airports, workshops, and other places that need to be kept quiet. Below is a typical construction process of a quiet room:


Planning and design: Firstly, planning and design is needed to determine the fabrication size, shape, material and sound insulation requirements of the quiet cabin.


Site survey and preparation: Survey and preparation work is carried out at the construction site, including measuring the size and shape of the space, understanding the construction environment and conditions, and determining the construction plan and schedule.

Cyspace Office Booth

Assembling pillars and side panels: The pillars and soundproof side panels of the quiet cabin are assembled first, and the soundproof side panels are usually made of soundproof boards or sound-absorbing materials.


Installation of soundproofing materials: After the pillars and side panels are constructed, soundproofing materials are installed, including sound-absorbing cotton, sound-insulating film, sound-insulating panels, etc.


Installation of cabin roof: Installation of the top cover above the soundprood booth, and at the same time, install the lighting and air-conditioning position of the top cover.


Installation of doors, windows and ventilation system: Installation of doors, windows and ventilation system to ensure smooth airflow inside and outside the silent cabin, and to meet the relevant sound insulation and heat preservation requirements.


Installation of floors and ceilings: Installation of the floors and ceilings of the soundprood booth, constructed using soundproofing and sound-absorbing materials.


Installation of electrical equipment: Installation of electrical equipment, including cables, power systems, distribution boxes, etc., and related sound insulation and protection measures.


Conduct sound insulation tests and adjustments: After the construction is completed, sound insulation tests and adjustments are conducted to ensure that the soundprood booth meets the design requirements and complies with the relevant norms and standards.


The above is a basic construction process of soundprood booth, the actual construction process may be slightly different because of the requirements of the specific project and the actual situation.


Related Articles
Office Booths
  • cyspace service
    Sample
  • cyspace service
    Factory
  • cyspace service
    Warranty
  • cyspace service
    Customization
Leave a Message

Feel free to contact us.

Email[email protected]

WhatsApp: +86 13316062192

Tel:+86 13316062192